Solar plant: site data
Solar power plant in Polivtsi, Chortkivskyi Raion, Ternopil Oblast
Polivtsi: 1,111 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.7% above the oblast median (1,093). #198 of 296 in the rayon, #199 of 744 in the oblast.
Chortkiv, the rayon centre, is 16 km away. 335 m above sea level. 16 km away: Chortkiv, the nearest bigger centre, 1,126 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 61 km. 11.22 m between rows, pitch 15.04 m (latitude 49.0°).
- Yield of 1 kWp
- 1,111kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,114kWh/year
- Row pitch
- 15.04m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Polivtsi
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 61 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 139 kWh/kWp, December: 31 — 4.5 times less.
January: 37 against 34 in the oblast, 8.8% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,557 | 695 | 155 |
| 10 | 11,114 | 1,390 | 310 |
| 15 | 16,671 | 2,085 | 465 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Popovtse0 km1,111 kWh/kWp
- Dzhuryn3 km1,113 kWh/kWp
- Palashivka3 km1,110 kWh/kWp
- Kryvoluka5 km1,113 kWh/kWp
- Bazar6 km1,110 kWh/kWp
- Rydoduby8 km1,113 kWh/kWp
All places: Chortkivskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.