Solar plant: site data

Solar power plant in Okhrymivtsi, Ternopilskyi Raion, Ternopil Oblast

Okhrymivtsi: 1,087 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.5% below the oblast median (1,093). #137 of 313 in the rayon, #459 of 744 in the oblast.

Ternopil, the rayon centre, is 12 km away. 311 m above sea level. 8 km away: Zbarazh, the nearest bigger centre, 1,078 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 13 km. 11.44 m between rows, pitch 15.31 m (latitude 49.6°).

Yield of 1 kWp
1,087kWh/year
Tilt
36°2° east of south
10 kW
10,869kWh/year
Row pitch
15.31m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Okhrymivtsi

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 13 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan49Feb90Mar117Apr130May134Jun138Jul136Aug111Sep83Oct36Nov30Dec

July: 138 kWh/kWp, December: 30 — 4.6 times less.

January: 31 against 34 in the oblast, 8.8% less.

Okhrymivtsi: plants, kWh
kWpA yearJulyDecember
55,435690150
1010,8691,380300
1516,3042,070450

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Ternopilskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.