Solar plant: site data
Solar power plant in Muzhyliv, Ternopilskyi Raion, Ternopil Oblast
Muzhyliv: 1,090 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,093). #106 of 313 in the rayon, #410 of 744 in the oblast.
Ternopil, the rayon centre, is 45 km away. 368 m above sea level. 5 km away: Pidhaytsi, the nearest bigger centre, the same 1,094. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 45 km. 11.47 m between rows, pitch 15.29 m (latitude 49.3°).
- Yield of 1 kWp
- 1,090kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 10,902kWh/year
- Row pitch
- 15.29m · GCR 0.31
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Muzhyliv
The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 45 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 137 kWh/kWp, December: 31 — 4.4 times less.
November: 40 against 38 in the oblast, 5.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,451 | 685 | 155 |
| 10 | 10,902 | 1,370 | 310 |
| 15 | 16,353 | 2,055 | 465 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Pidhaytsi5 km1,094 kWh/kWp
- Myrne5 km1,092 kWh/kWp
- Rudnyky6 km1,099 kWh/kWp
- Uhryniv6 km1,097 kWh/kWp
- Novosilka7 km1,087 kWh/kWp
- Siltse7 km1,094 kWh/kWp
All places: Ternopilskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.