Solar power plant in Lysychnyky, Chortkivskyi Raion, Ternopil Oblast

Lysychnyky: 1,090 kWh per kWp a year, tilt 36° 13° east of south (PVGIS). Exactly the oblast median (1,093). #290 of 296 in the rayon, #409 of 744 in the oblast.

Chortkiv, the rayon centre, is 36 km away. 244 m above sea level. 20 km away: Zastavna, the nearest bigger centre, 1,131 — 3.6% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 46 km. 10.72 m between rows, pitch 14.59 m (latitude 48.7°).

Yield of 1 kWp
1,090kWh/year
Tilt
36°13° east of south
10 kW
10,904kWh/year
Row pitch
14.59m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Lysychnyky

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 46 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan50Feb92Mar117Apr133May133Jun140Jul135Aug110Sep81Oct37Nov26Dec

July: 140 kWh/kWp, December: 26 — 5.4 times less.

December: 26 against 30 in the oblast, 13.3% less.

Lysychnyky: plants, kWh
kWpA yearJulyDecember
55,452700130
1010,9041,400260
1516,3562,100390

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chortkivskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.