Solar plant: site data

Solar power plant in Laskivtsi, Ternopilskyi Raion, Ternopil Oblast

Laskivtsi: 1,106 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.2% above the oblast median (1,093). #6 of 313 in the rayon, #252 of 744 in the oblast.

Ternopil, the rayon centre, is 43 km away. 340 m above sea level. 17 km away: Terebovlia, the nearest bigger centre, the same 1,104. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 42 km. 11.35 m between rows, pitch 15.17 m (latitude 49.2°).

Yield of 1 kWp
1,106kWh/year
Tilt
37°2° east of south
10 kW
11,061kWh/year
Row pitch
15.17m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Laskivtsi

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 42 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan54Feb95Mar117Apr131May133Jun138Jul135Aug112Sep86Oct40Nov30Dec

July: 138 kWh/kWp, December: 30 — 4.6 times less.

January: 36 against 34 in the oblast, 5.9% more.

Laskivtsi: plants, kWh
kWpA yearJulyDecember
55,531690150
1011,0611,380300
1516,5922,070450

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Ternopilskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.