Solar plant: site data
Solar power plant in Kliuvyntsi, Chortkivskyi Raion, Ternopil Oblast
Kliuvyntsi: 1,105 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.2% above the oblast median (1,093). #252 of 296 in the rayon, #259 of 744 in the oblast.
Chortkiv, the rayon centre, is 30 km away. 309 m above sea level. 22 km away: Terebovlia, the nearest bigger centre, the same 1,104. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 43 km. 11.16 m between rows, pitch 15.03 m (latitude 49.3°).
- Yield of 1 kWp
- 1,105kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,051kWh/year
- Row pitch
- 15.03m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Kliuvyntsi
The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 43 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 140 kWh/kWp, December: 30 — 4.7 times less.
January: 33 against 34 in the oblast, 2.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,526 | 700 | 150 |
| 10 | 11,051 | 1,400 | 300 |
| 15 | 16,577 | 2,100 | 450 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Peremyliv4 km1,101 kWh/kWp
- Olenivka4 km1,107 kWh/kWp
- Soroka5 km1,111 kWh/kWp
- Khorostkiv7 km1,107 kWh/kWp
- Butsyki8 km1,101 kWh/kWp
- Tovste8 km1,108 kWh/kWp
All places: Chortkivskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.