Solar plant: site data

Solar power plant in Buhliv, Kremenetskyi Raion, Ternopil Oblast

Buhliv: 1,081 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.0% below the oblast median (1,093). #73 of 135 in the rayon, #612 of 744 in the oblast.

Kremenets, the rayon centre, is 44 km away. 297 m above sea level. 23 km away: Zbarazh, the nearest bigger centre, the same 1,078. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 41 km. 11.59 m between rows, pitch 15.46 m (latitude 49.8°).

Yield of 1 kWp
1,081kWh/year
Tilt
36°1° east of south
10 kW
10,813kWh/year
Row pitch
15.46m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Buhliv

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 41 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan46Feb84Mar118Apr133May135Jun140Jul136Aug112Sep84Oct37Nov29Dec

July: 140 kWh/kWp, January: 29 — 4.8 times less.

January: 29 against 34 in the oblast, 14.7% less.

Buhliv: plants, kWh
kWpA yearJulyJanuary
55,407700145
1010,8131,400290
1516,2202,100435

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kremenetskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.