Solar plant: site data
Solar power plant in Bilyi Potik, Chortkivskyi Raion, Ternopil Oblast
Bilyi Potik: 1,117 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.3% above the oblast median (1,093). #142 of 296 in the rayon, #142 of 744 in the oblast.
Chortkiv, the rayon centre, is 11 km away. 288 m above sea level. 11 km away: Chortkiv, the nearest bigger centre, 1,126 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 53 km. 11.28 m between rows, pitch 15.10 m (latitude 49.1°).
- Yield of 1 kWp
- 1,117kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,172kWh/year
- Row pitch
- 15.10m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,390 / 520Pa
Ground frame designer
A ground frame for a solar plant: Bilyi Potik
The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 53 km: snow 1,390 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 138 kWh/kWp, December: 33 — 4.2 times less.
January: 41 against 34 in the oblast, 20.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,586 | 690 | 165 |
| 10 | 11,172 | 1,380 | 330 |
| 15 | 16,758 | 2,070 | 495 |
Example: a 10 kW ground frame
For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Rydoduby3 km1,113 kWh/kWp
- Bilobozhnytsia3 km1,123 kWh/kWp
- Bychkivtsi3 km1,117 kWh/kWp
- Kosiv4 km1,113 kWh/kWp
- Skorodyntsi5 km1,126 kWh/kWp
- Kalynivshchyna5 km1,126 kWh/kWp
All places: Chortkivskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.