Solar plant: site data

Solar power plant in Beremiany, Chortkivskyi Raion, Ternopil Oblast

Beremiany: 1,120 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.5% above the oblast median (1,093). #118 of 296 in the rayon, #118 of 744 in the oblast.

Chortkiv, the rayon centre, is 29 km away. 354 m above sea level. 29 km away: Chortkiv, the nearest bigger centre, 1,126 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 54 km. 11.12 m between rows, pitch 14.94 m (latitude 48.9°).

Yield of 1 kWp
1,120kWh/year
Tilt
37°1° east of south
10 kW
11,196kWh/year
Row pitch
14.94m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,410 / 500Pa

Ground frame designer

A ground frame for a solar plant: Beremiany

The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 54 km: snow 1,410 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan56Feb96Mar117Apr130May130Jun139Jul135Aug112Sep87Oct43Nov35Dec

July: 139 kWh/kWp, December: 35 — 4.0 times less.

January: 41 against 34 in the oblast, 20.6% more.

Beremiany: plants, kWh
kWpA yearJulyDecember
55,598695175
1011,1961,390350
1516,7942,085525

Snow and wind: Івано-Франківськ

Example: a 10 kW ground frame

For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chortkivskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.