Solar plant: site data

Solar power plant in Sushylyne, Sumskyi Raion, Sumy Oblast

Sushylyne: 1,099 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.9% below the oblast median (1,110). #392 of 466 in the rayon, #1232 of 1534 in the oblast.

Sumy, the rayon centre, is 28 km away. 169 m above sea level. 28 km away: Sumy, the nearest bigger centre, 1,117 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 28 km. 13.00 m between rows, pitch 16.82 m (latitude 50.9°).

Yield of 1 kWp
1,099kWh/year
Tilt
37°2° east of south
10 kW
10,993kWh/year
Row pitch
16.82m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sushylyne

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Суми, 28 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan55Feb90Mar114Apr140May143Jun144Jul141Aug110Sep75Oct34Nov20Dec

July: 144 kWh/kWp, December: 20 — 7.2 times less.

December: 20 against 23 in the oblast, 13.0% less.

Sushylyne: plants, kWh
kWpA yearJulyDecember
55,497720100
1010,9931,440200
1516,4902,160300

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sumskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.