Solar plant: site data

Solar power plant in Sukhoverkhivka, Konotopskyi Raion, Sumy Oblast

Sukhoverkhivka: 1,115 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,110). #6 of 318 in the rayon, #510 of 1534 in the oblast.

Konotop, the rayon centre, is 53 km away. 167 m above sea level. 40 km away: Romny, the nearest bigger centre, 1,126 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 66 km. 13.41 m between rows, pitch 17.18 m (latitude 51.0°).

Yield of 1 kWp
1,115kWh/year
Tilt
38°1° east of south
10 kW
11,147kWh/year
Row pitch
17.18m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sukhoverkhivka

The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Суми, 66 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan59Feb94Mar115Apr140May142Jun144Jul141Aug109Sep76Oct35Nov24Dec

July: 144 kWh/kWp, December: 24 — 6.0 times less.

December: 24 against 23 in the oblast, 4.3% more.

Sukhoverkhivka: plants, kWh
kWpA yearJulyDecember
55,574720120
1011,1471,440240
1516,7212,160360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Konotopskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources