Solar plant: site data

Solar power plant in Stara Huta, Shostkynskyi Raion, Sumy Oblast

Stara Huta: 1,052 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 5.2% below the oblast median (1,110). #258 of 258 in the rayon, #1534 of 1534 in the oblast.

Shostka, the rayon centre, is 54 km away. 148 m above sea level. 49 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 2.9% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 170 km. 15.35 m between rows, pitch 19.07 m (latitude 52.3°).

Yield of 1 kWp
1,052kWh/year
Tilt
39°2° east of south
10 kW
10,520kWh/year
Row pitch
19.07m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Stara Huta

The designer opens with this place’s coordinates, latitude 52.3° for the row spacing and the DBN loads of the nearest regional centre — Суми, 170 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan56Feb94Mar111Apr135May136Jun133Jul131Aug101Sep66Oct31Nov22Dec

June: 136 kWh/kWp, December: 22 — 6.2 times less.

October: 66 against 75 in the oblast, 12.0% less.

Stara Huta: plants, kWh
kWpA yearJuneDecember
55,260680110
1010,5201,360220
1515,7802,040330

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.