Solar plant: site data

Solar power plant in Sorokyne, Shostkynskyi Raion, Sumy Oblast

Sorokyne: 1,095 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.4% below the oblast median (1,110). #113 of 258 in the rayon, #1349 of 1534 in the oblast.

Shostka, the rayon centre, is 49 km away. 193 m above sea level. 49 km away: Shostka, the nearest bigger centre, 1,082 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 150 km. 15.15 m between rows, pitch 18.87 m (latitude 52.2°).

Yield of 1 kWp
1,095kWh/year
Tilt
39°2° east of south
10 kW
10,945kWh/year
Row pitch
18.87m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sorokyne

The designer opens with this place’s coordinates, latitude 52.2° for the row spacing and the DBN loads of the nearest regional centre — Суми, 150 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan62Feb101Mar115Apr138May141Jun138Jul134Aug105Sep68Oct31Nov23Dec

June: 141 kWh/kWp, December: 23 — 6.1 times less.

November: 31 against 35 in the oblast, 11.4% less.

Sorokyne: plants, kWh
kWpA yearJuneDecember
55,473705115
1010,9451,410230
1516,4182,115345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.