Solar power plant in Shylivske, Romenskyi Raion, Sumy Oblast

Shylivske: 1,116 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.6% above the oblast median (1,110). #119 of 305 in the rayon, #464 of 1534 in the oblast.

Romny, the rayon centre, is 9 km away. 155 m above sea level. 9 km away: Romny, the nearest bigger centre, 1,126 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 85 km. 12.81 m between rows, pitch 16.63 m (latitude 50.7°).

Yield of 1 kWp
1,116kWh/year
Tilt
37°1° east of south
10 kW
11,164kWh/year
Row pitch
16.63m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Shylivske

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Суми, 85 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan57Feb93Mar116Apr139May142Jun145Jul143Aug111Sep78Oct35Nov23Dec

July: 145 kWh/kWp, December: 23 — 6.3 times less.

October: 78 against 75 in the oblast, 4.0% more.

Shylivske: plants, kWh
kWpA yearJulyDecember
55,582725115
1011,1641,450230
1516,7462,175345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed