Solar plant: site data

Solar power plant in Pustohorod, Shostkynskyi Raion, Sumy Oblast

Pustohorod: 1,095 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.4% below the oblast median (1,110). #111 of 258 in the rayon, #1346 of 1534 in the oblast.

Shostka, the rayon centre, is 45 km away. 178 m above sea level. 45 km away: Shostka, the nearest bigger centre, 1,082 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 114 km. 14.41 m between rows, pitch 18.18 m (latitude 51.8°).

Yield of 1 kWp
1,095kWh/year
Tilt
38°1° east of south
10 kW
10,946kWh/year
Row pitch
18.18m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Pustohorod

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Суми, 114 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan61Feb92Mar115Apr139May143Jun140Jul137Aug106Sep70Oct33Nov22Dec

June: 143 kWh/kWp, December: 22 — 6.5 times less.

October: 70 against 75 in the oblast, 6.7% less.

Pustohorod: plants, kWh
kWpA yearJuneDecember
55,473715110
1010,9461,430220
1516,4192,145330

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.