Solar plant: site data

Solar power plant in Pohrebky, Shostkynskyi Raion, Sumy Oblast

Pohrebky: 1,089 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.9% below the oblast median (1,110). #163 of 258 in the rayon, #1414 of 1534 in the oblast.

Shostka, the rayon centre, is 13 km away. 128 m above sea level. 9 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 153 km. 14.89 m between rows, pitch 18.61 m (latitude 52.0°).

Yield of 1 kWp
1,089kWh/year
Tilt
39°2° east of south
10 kW
10,889kWh/year
Row pitch
18.61m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Pohrebky

The designer opens with this place’s coordinates, latitude 52.0° for the row spacing and the DBN loads of the nearest regional centre — Суми, 153 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan59Feb99Mar114Apr138May141Jun137Jul134Aug105Sep70Oct31Nov24Dec

June: 141 kWh/kWp, December: 24 — 5.9 times less.

November: 31 against 35 in the oblast, 11.4% less.

Pohrebky: plants, kWh
kWpA yearJuneDecember
55,445705120
1010,8891,410240
1516,3342,115360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.