Solar plant: site data

Solar power plant in Novytske, Romenskyi Raion, Sumy Oblast

Novytske: 1,125 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.4% above the oblast median (1,110). #49 of 305 in the rayon, #256 of 1534 in the oblast.

Romny, the rayon centre, is 27 km away. 150 m above sea level. 27 km away: Romny, the nearest bigger centre, the same 1,126. Snow and wind from the nearest regional centre in the DBN — Суми, 109 km. 12.57 m between rows, pitch 16.39 m (latitude 50.5°).

Yield of 1 kWp
1,125kWh/year
Tilt
37°1° east of south
10 kW
11,247kWh/year
Row pitch
16.39m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Novytske

The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Суми, 109 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb93Mar117Apr139May143Jun146Jul144Aug112Sep79Oct35Nov24Dec

July: 146 kWh/kWp, December: 24 — 6.1 times less.

October: 79 against 75 in the oblast, 5.3% more.

Novytske: plants, kWh
kWpA yearJulyDecember
55,624730120
1011,2471,460240
1516,8712,190360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Romenskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.