Solar plant: site data

Solar power plant in Nizhynske, Konotopskyi Raion, Sumy Oblast

Nizhynske: 1,089 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.9% below the oblast median (1,110). #301 of 318 in the rayon, #1421 of 1534 in the oblast.

Konotop, the rayon centre, is 44 km away. 151 m above sea level. 29 km away: Shostka, the nearest bigger centre, 1,082 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 126 km. 14.11 m between rows, pitch 17.88 m (latitude 51.6°).

Yield of 1 kWp
1,089kWh/year
Tilt
38°2° east of south
10 kW
10,886kWh/year
Row pitch
17.88m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Nizhynske

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Суми, 126 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan58Feb97Mar114Apr138May139Jun138Jul135Aug105Sep71Oct33Nov24Dec

June: 139 kWh/kWp, December: 24 — 5.8 times less.

November: 33 against 35 in the oblast, 5.7% less.

Nizhynske: plants, kWh
kWpA yearJuneDecember
55,443695120
1010,8861,390240
1516,3292,085360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Konotopskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.