Moskalenky: 1,104 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 0.6% below the oblast median (1,110). #26 of 258 in the rayon, #1080 of 1534 in the oblast.

Shostka, the rayon centre, is 40 km away. 185 m above sea level. 40 km away: Shostka, the nearest bigger centre, 1,082 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 105 km. 14.56 m between rows, pitch 18.28 m (latitude 51.7°).

Yield of 1 kWp
1,104kWh/year
Tilt
39°2° east of south
10 kW
11,035kWh/year
Row pitch
18.28m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Moskalenky

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Суми, 105 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan61Feb97Mar115Apr140May143Jun140Jul136Aug107Sep71Oct33Nov22Dec

June: 143 kWh/kWp, December: 22 — 6.5 times less.

November: 33 against 35 in the oblast, 5.7% less.

Moskalenky: plants, kWh
kWpA yearJuneDecember
55,518715110
1011,0351,430220
1516,5532,145330

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.