Solar power plant in Botsmaniv, Konotopskyi Raion, Sumy Oblast

Botsmaniv: 1,100 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 0.9% below the oblast median (1,110). #276 of 318 in the rayon, #1218 of 1534 in the oblast.

Konotop, the rayon centre, is 35 km away. 160 m above sea level. 35 km away: Konotop, the nearest bigger centre, 1,110 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 125 km. 14.02 m between rows, pitch 17.79 m (latitude 51.5°).

Yield of 1 kWp
1,100kWh/year
Tilt
38°2° east of south
10 kW
10,998kWh/year
Row pitch
17.79m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Botsmaniv

The designer opens with this place’s coordinates, latitude 51.5° for the row spacing and the DBN loads of the nearest regional centre — Суми, 125 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan59Feb97Mar115Apr139May141Jun140Jul137Aug107Sep73Oct33Nov23Dec

June: 141 kWh/kWp, December: 23 — 6.1 times less.

November: 33 against 35 in the oblast, 5.7% less.

Botsmaniv: plants, kWh
kWpA yearJuneDecember
55,499705115
1010,9981,410230
1516,4972,115345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Konotopskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.