Boshivka: 1,108 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,110). #99 of 318 in the rayon, #821 of 1534 in the oblast.

Konotop, the rayon centre, is 57 km away. 160 m above sea level. 50 km away: Romny, the nearest bigger centre, 1,126 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 60 km. 13.48 m between rows, pitch 17.25 m (latitude 51.1°).

Yield of 1 kWp
1,108kWh/year
Tilt
38°1° east of south
10 kW
11,083kWh/year
Row pitch
17.25m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Boshivka

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Суми, 60 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan57Feb92Mar114Apr140May143Jun144Jul141Aug109Sep75Oct35Nov23Dec

July: 144 kWh/kWp, December: 23 — 6.3 times less.

February: 57 against 59 in the oblast, 3.4% less.

Boshivka: plants, kWh
kWpA yearJulyDecember
55,542720115
1011,0831,440230
1516,6252,160345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Konotopskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.