Solar plant: site data
Solar power plant in Borodanove, Romenskyi Raion, Sumy Oblast
Borodanove: 1,108 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,110). #249 of 305 in the rayon, #831 of 1534 in the oblast.
Romny, the rayon centre, is 17 km away. 158 m above sea level. 17 km away: Romny, the nearest bigger centre, 1,126 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 77 km. 12.85 m between rows, pitch 16.67 m (latitude 50.8°).
- Yield of 1 kWp
- 1,108kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,081kWh/year
- Row pitch
- 16.67m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,670 / 420Pa
Ground frame designer
A ground frame for a solar plant: Borodanove
The designer opens with this place’s coordinates, latitude 50.8° for the row spacing and the DBN loads of the nearest regional centre — Суми, 77 km: snow 1,670 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 145 kWh/kWp, December: 22 — 6.6 times less.
March: 89 against 95 in the oblast, 6.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,541 | 725 | 110 |
| 10 | 11,081 | 1,450 | 220 |
| 15 | 16,622 | 2,175 | 330 |
Example: a 10 kW ground frame
For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.