Solar plant: site data

Solar power plant in Ternivka, Sevastopol City

Ternivka: 1,296 kWh per kWp a year, tilt 35° 1° east of south (PVGIS). 2.8% below the oblast median (1,333). #30 of 42 in the oblast.

185 m above sea level. 18 km away: Sevastopol, the nearest bigger centre, 1,372 — 5.6% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 245 km. 8.05 m between rows, pitch 11.97 m (latitude 44.6°).

Yield of 1 kWp
1,296kWh/year
Tilt
35°1° east of south
10 kW
12,958kWh/year
Row pitch
11.97m · GCR 0.40
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Ternivka

The designer opens with this place’s coordinates, latitude 44.6° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 245 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

52Jan69Feb103Mar128Apr142May143Jun153Jul151Aug128Sep106Oct70Nov50Dec

July: 153 kWh/kWp, December: 50 — 3.1 times less.

March: 103 against 108 in the oblast, 4.6% less.

Ternivka: plants, kWh
kWpA yearJulyDecember
56,479765250
1012,9581,530500
1519,4372,295750

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

Sevastopol City: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.