Solar plant: site data
Solar power plant in Chornorichchya, Sevastopol City
Chornorichchya: 1,250 kWh per kWp a year, tilt 33° 18° west of south (PVGIS). 6.2% below the oblast median (1,333). #40 of 42 in the oblast.
27 m above sea level. 14 km away: Sevastopol, the nearest bigger centre, 1,372 — 8.9% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 247 km. 7.63 m between rows, pitch 11.64 m (latitude 44.5°).
- Yield of 1 kWp
- 1,250kWh/year
- Tilt
- 33°18° west of south
- 10 kW
- 12,502kWh/year
- Row pitch
- 11.64m · GCR 0.41
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Chornorichchya
The designer opens with this place’s coordinates, latitude 44.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 247 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 159 kWh/kWp, December: 38 — 4.2 times less.
December: 38 against 51 in the oblast, 25.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,251 | 795 | 190 |
| 10 | 12,502 | 1,590 | 380 |
| 15 | 18,753 | 2,385 | 570 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.