Solar plant: site data

Solar power plant in Peredove, Sevastopol City

Peredove: 1,289 kWh per kWp a year, tilt 35° 4° east of south (PVGIS). 3.3% below the oblast median (1,333). #34 of 42 in the oblast.

332 m above sea level. 27 km away: Sevastopol, the nearest bigger centre, 1,372 — 6.0% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 255 km. 8.02 m between rows, pitch 11.94 m (latitude 44.5°).

Yield of 1 kWp
1,289kWh/year
Tilt
35°4° east of south
10 kW
12,892kWh/year
Row pitch
11.94m · GCR 0.40
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Peredove

The designer opens with this place’s coordinates, latitude 44.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 255 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

53Jan69Feb103Mar127Apr140May141Jun151Jul150Aug126Sep105Oct71Nov52Dec

July: 151 kWh/kWp, December: 52 — 2.9 times less.

June: 141 against 150 in the oblast, 5.7% less.

Peredove: plants, kWh
kWpA yearJulyDecember
56,446755260
1012,8921,510520
1519,3382,265780

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks