Solar plant: site data
Solar power plant in Balaklava, Sevastopol City
Balaklava: 1,354 kWh per kWp a year, tilt 34° 1° west of south (PVGIS). 1.6% above the oblast median (1,333). #15 of 42 in the oblast.
10 m above sea level. 12 km away: Sevastopol, the nearest bigger centre, 1,372 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 249 km. 7.82 m between rows, pitch 11.79 m (latitude 44.5°).
- Yield of 1 kWp
- 1,354kWh/year
- Tilt
- 34°1° west of south
- 10 kW
- 13,538kWh/year
- Row pitch
- 11.79m · GCR 0.41
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Balaklava
The designer opens with this place’s coordinates, latitude 44.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 249 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 165 kWh/kWp, December: 46 — 3.6 times less.
December: 46 against 51 in the oblast, 9.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,769 | 825 | 230 |
| 10 | 13,538 | 1,650 | 460 |
| 15 | 20,307 | 2,475 | 690 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.