Solar plant: site data

Solar power plant in Rusyvel, Rivnenskyi Raion, Rivne Oblast

Rusyvel: 1,103 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.8% above the oblast median (1,084). #19 of 450 in the rayon, #20 of 1044 in the oblast.

Rivne, the rayon centre, is 42 km away. 210 m above sea level. 29 km away: Slavuta, the nearest bigger centre, 1,070 — 3.1% more here. Snow and wind from the nearest regional centre in the DBN — Рівне, 41 km. 12.62 m between rows, pitch 16.44 m (latitude 50.6°).

Yield of 1 kWp
1,103kWh/year
Tilt
37°1° east of south
10 kW
11,031kWh/year
Row pitch
16.44m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Rusyvel

The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 41 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan53Feb91Mar120Apr136May139Jun139Jul137Aug111Sep82Oct36Nov28Dec

June: 139 kWh/kWp, December: 28 — 5.0 times less.

May: 136 against 130 in the oblast, 4.6% more.

Rusyvel: plants, kWh
kWpA yearJuneDecember
55,516695140
1011,0311,390280
1516,5472,085420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Rivnenskyi RaionRivne Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.