Solar power plant in Komarivka, Rivnenskyi Raion, Rivne Oblast

Komarivka: 1,072 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.0% below the oblast median (1,084). #421 of 450 in the rayon, #789 of 1044 in the oblast.

Rivne, the rayon centre, is 50 km away. 162 m above sea level. 35 km away: Sarny, the nearest bigger centre, 1,063 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Рівне, 50 km. 13.47 m between rows, pitch 17.24 m (latitude 51.1°).

Yield of 1 kWp
1,072kWh/year
Tilt
38°3° east of south
10 kW
10,724kWh/year
Row pitch
17.24m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Komarivka

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 50 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb93Mar116Apr128May133Jun134Jul133Aug106Sep78Oct35Nov28Dec

July: 134 kWh/kWp, December: 28 — 4.8 times less.

January: 34 against 32 in the oblast, 6.3% more.

Komarivka: plants, kWh
kWpA yearJulyDecember
55,362670140
1010,7241,340280
1516,0862,010420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Rivnenskyi RaionRivne Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.