Solar plant: site data
Solar power plant in Ilpin, Rivnenskyi Raion, Rivne Oblast
Ilpin: 1,097 kWh per kWp a year, tilt 38° facing south (PVGIS). 1.2% above the oblast median (1,084). #161 of 450 in the rayon, #175 of 1044 in the oblast.
Rivne, the rayon centre, is 10 km away. 189 m above sea level. 10 km away: Rivne, the nearest bigger centre, the same 1,094. Snow and wind from the nearest regional centre in the DBN — Рівне, 10 km. 12.89 m between rows, pitch 16.66 m (latitude 50.5°).
- Yield of 1 kWp
- 1,097kWh/year
- Tilt
- 38°facing south
- 10 kW
- 10,971kWh/year
- Row pitch
- 16.66m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,320 / 520Pa
Ground frame designer
A ground frame for a solar plant: Ilpin
The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 10 km: snow 1,320 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 138 kWh/kWp, December: 29 — 4.8 times less.
December: 29 against 28 in the oblast, 3.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,486 | 690 | 145 |
| 10 | 10,971 | 1,380 | 290 |
| 15 | 16,457 | 2,070 | 435 |
Example: a 10 kW ground frame
For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.