Solar plant: site data

Solar power plant in Budky-Kamianski, Sarnenskyi Raion, Rivne Oblast

Budky-Kamianski: 1,065 kWh per kWp a year, tilt 39° 5° east of south (PVGIS). 1.7% below the oblast median (1,084). #117 of 185 in the rayon, #899 of 1044 in the oblast.

Sarny, the rayon centre, is 81 km away. 145 m above sea level. 81 km away: Sarny, the nearest bigger centre, the same 1,063. Snow and wind from the nearest regional centre in the DBN — Рівне, 148 km. 14.41 m between rows, pitch 18.13 m (latitude 51.6°).

Yield of 1 kWp
1,065kWh/year
Tilt
39°5° east of south
10 kW
10,654kWh/year
Row pitch
18.13m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Budky-Kamianski

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 148 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan55Feb88Mar116Apr128May135Jun133Jul132Aug107Sep76Oct33Nov27Dec

June: 135 kWh/kWp, December: 27 — 5.0 times less.

November: 33 against 36 in the oblast, 8.3% less.

Budky-Kamianski: plants, kWh
kWpA yearJuneDecember
55,327675135
1010,6541,350270
1515,9812,025405

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sarnenskyi RaionRivne Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.