Solar plant: site data

Solar power plant in Bronne, Rivnenskyi Raion, Rivne Oblast

Bronne: 1,083 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). Exactly the oblast median (1,084). #327 of 450 in the rayon, #536 of 1044 in the oblast.

Rivne, the rayon centre, is 59 km away. 171 m above sea level. 28 km away: Sarny, the nearest bigger centre, 1,063 — 1.9% more here. Snow and wind from the nearest regional centre in the DBN — Рівне, 58 km. 13.49 m between rows, pitch 17.26 m (latitude 51.1°).

Yield of 1 kWp
1,083kWh/year
Tilt
38°3° east of south
10 kW
10,831kWh/year
Row pitch
17.26m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Bronne

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 58 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan55Feb93Mar118Apr131May135Jun136Jul135Aug108Sep80Oct35Nov27Dec

July: 136 kWh/kWp, December: 27 — 5.0 times less.

December: 27 against 28 in the oblast, 3.6% less.

Bronne: plants, kWh
kWpA yearJulyDecember
55,416680135
1010,8311,360270
1516,2462,040405

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Rivnenskyi RaionRivne Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.