Borshchivka Druha: 1,077 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.6% below the oblast median (1,084). #390 of 450 in the rayon, #718 of 1044 in the oblast.

Rivne, the rayon centre, is 32 km away. 253 m above sea level. 32 km away: Rivne, the nearest bigger centre, 1,094 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 32 km. 12.40 m between rows, pitch 16.22 m (latitude 50.3°).

Yield of 1 kWp
1,077kWh/year
Tilt
37°2° east of south
10 kW
10,767kWh/year
Row pitch
16.22m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Borshchivka Druha

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 32 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan54Feb91Mar115Apr131May133Jun136Jul134Aug109Sep81Oct34Nov24Dec

July: 136 kWh/kWp, December: 24 — 5.7 times less.

December: 24 against 28 in the oblast, 14.3% less.

Borshchivka Druha: plants, kWh
kWpA yearJulyDecember
55,384680120
1010,7671,360240
1516,1512,040360

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Rivnenskyi RaionRivne Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.