Solar plant: site data

Solar power plant in Voronyntsi, Lubenskyi Raion, Poltava Oblast

Voronyntsi: 1,130 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.0% below the oblast median (1,142). #217 of 346 in the rayon, #1488 of 1856 in the oblast.

Lubny, the rayon centre, is 21 km away. 110 m above sea level. 21 km away: Lubny, the nearest bigger centre, 1,146 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 79 km. 12.10 m between rows, pitch 15.92 m (latitude 50.0°).

Yield of 1 kWp
1,130kWh/year
Tilt
37°1° east of south
10 kW
11,304kWh/year
Row pitch
15.92m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Voronyntsi

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 79 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan56Feb95Mar119Apr140May142Jun146Jul143Aug114Sep82Oct38Nov23Dec

July: 146 kWh/kWp, December: 23 — 6.3 times less.

January: 32 against 35 in the oblast, 8.6% less.

Voronyntsi: plants, kWh
kWpA yearJulyDecember
55,652730115
1011,3041,460230
1516,9562,190345

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.