Solar plant: site data

Solar power plant in Velykoseletske, Lubenskyi Raion, Poltava Oblast

Velykoseletske: 1,154 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.1% above the oblast median (1,142). #7 of 346 in the rayon, #407 of 1856 in the oblast.

Lubny, the rayon centre, is 27 km away. 88 m above sea level. 27 km away: Lubny, the nearest bigger centre, 1,146 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 67 km. 11.91 m between rows, pitch 15.73 m (latitude 49.8°).

Yield of 1 kWp
1,154kWh/year
Tilt
37°2° east of south
10 kW
11,539kWh/year
Row pitch
15.73m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Velykoseletske

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 67 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan60Feb98Mar120Apr140May143Jun146Jul145Aug115Sep84Oct39Nov26Dec

July: 146 kWh/kWp, December: 26 — 5.6 times less.

February: 60 against 56 in the oblast, 7.1% more.

Velykoseletske: plants, kWh
kWpA yearJulyDecember
55,770730130
1011,5391,460260
1517,3092,190390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.