Solar plant: site data

Solar power plant in Stovbyne, Myrhorodskyi Raion, Poltava Oblast

Stovbyne: 1,134 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.7% below the oblast median (1,142). #178 of 430 in the rayon, #1328 of 1856 in the oblast.

Myrhorod, the rayon centre, is 15 km away. 128 m above sea level. 15 km away: Myrhorod, the nearest bigger centre, the same 1,133. Snow and wind from the nearest regional centre in the DBN — Полтава, 94 km. 12.15 m between rows, pitch 15.97 m (latitude 50.1°).

Yield of 1 kWp
1,134kWh/year
Tilt
37°2° east of south
10 kW
11,342kWh/year
Row pitch
15.97m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Stovbyne

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 94 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan55Feb94Mar119Apr139May144Jun148Jul146Aug114Sep82Oct37Nov24Dec

July: 148 kWh/kWp, December: 24 — 6.2 times less.

November: 37 against 39 in the oblast, 5.1% less.

Stovbyne: plants, kWh
kWpA yearJulyDecember
55,671740120
1011,3421,480240
1517,0132,220360

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.