Shevchenkove: 1,139 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,142). #561 of 751 in the rayon, #1077 of 1856 in the oblast.

Poltava, the rayon centre, is 35 km away. 90 m above sea level. 14 km away: Dykanka, the nearest bigger centre, 1,149 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 35 km. 11.98 m between rows, pitch 15.80 m (latitude 49.9°).

Yield of 1 kWp
1,139kWh/year
Tilt
37°2° east of south
10 kW
11,394kWh/year
Row pitch
15.80m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Shevchenkove

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 35 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan58Feb95Mar116Apr137May140Jun146Jul146Aug117Sep82Oct40Nov25Dec

July: 146 kWh/kWp, December: 25 — 5.8 times less.

January: 38 against 35 in the oblast, 8.6% more.

Shevchenkove: plants, kWh
kWpA yearJulyDecember
55,697730125
1011,3941,460250
1517,0912,190375

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Poltavskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.