Solar plant: site data
Solar power plant in Shevchenkove, Myrhorodskyi Raion, Poltava Oblast
Shevchenkove: 1,124 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.5% below the oblast median (1,142). #342 of 430 in the rayon, #1732 of 1856 in the oblast.
Myrhorod, the rayon centre, is 68 km away. 145 m above sea level. 17 km away: Hadyach, the nearest bigger centre, the same 1,120. Snow and wind from the nearest regional centre in the DBN — Суми, 72 km. 12.59 m between rows, pitch 16.41 m (latitude 50.5°).
- Yield of 1 kWp
- 1,124kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,244kWh/year
- Row pitch
- 16.41m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,670 / 420Pa
Ground frame designer
A ground frame for a solar plant: Shevchenkove
The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Суми, 72 km: snow 1,670 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 145 kWh/kWp, December: 23 — 6.3 times less.
December: 23 against 25 in the oblast, 8.0% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,622 | 725 | 115 |
| 10 | 11,244 | 1,450 | 230 |
| 15 | 16,866 | 2,175 | 345 |
Example: a 10 kW ground frame
For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.
How these numbers are computed
Nearby
- Berizky3 km1,124 kWh/kWp
- Melnykove3 km1,125 kWh/kWp
- Slobodka3 km1,126 kWh/kWp
- Svatky4 km1,129 kWh/kWp
- Birky5 km1,129 kWh/kWp
- Halaievets5 km1,112 kWh/kWp
All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.