Solar plant: site data

Solar power plant in Ruchky, Myrhorodskyi Raion, Poltava Oblast

Ruchky: 1,128 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.2% below the oblast median (1,142). #273 of 430 in the rayon, #1580 of 1856 in the oblast.

Myrhorod, the rayon centre, is 63 km away. 106 m above sea level. 33 km away: Romny, the nearest bigger centre, the same 1,126. Snow and wind from the nearest regional centre in the DBN — Суми, 119 km. 12.85 m between rows, pitch 16.62 m (latitude 50.5°).

Yield of 1 kWp
1,128kWh/year
Tilt
38°1° east of south
10 kW
11,284kWh/year
Row pitch
16.62m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Ruchky

The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Суми, 119 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan58Feb94Mar117Apr139May143Jun145Jul143Aug112Sep80Oct36Nov25Dec

July: 145 kWh/kWp, December: 25 — 5.8 times less.

November: 36 against 39 in the oblast, 7.7% less.

Ruchky: plants, kWh
kWpA yearJulyDecember
55,642725125
1011,2841,450250
1516,9262,175375

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.