Solar power plant in Levko-Romodan, Myrhorodskyi Raion, Poltava Oblast

Levko-Romodan: 1,136 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.5% below the oblast median (1,142). #148 of 430 in the rayon, #1248 of 1856 in the oblast.

Myrhorod, the rayon centre, is 30 km away. 141 m above sea level. 21 km away: Lubny, the nearest bigger centre, 1,146 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 96 km. 11.98 m between rows, pitch 15.80 m (latitude 49.9°).

Yield of 1 kWp
1,136kWh/year
Tilt
37°2° east of south
10 kW
11,360kWh/year
Row pitch
15.80m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Levko-Romodan

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 96 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan53Feb92Mar118Apr140May143Jun148Jul146Aug116Sep84Oct38Nov24Dec

July: 148 kWh/kWp, December: 24 — 6.2 times less.

February: 53 against 56 in the oblast, 5.4% less.

Levko-Romodan: plants, kWh
kWpA yearJulyDecember
55,680740120
1011,3601,480240
1517,0402,220360

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.