Solar plant: site data

Solar power plant in Polove, Lubenskyi Raion, Poltava Oblast

Polove: 1,126 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.4% below the oblast median (1,142). #305 of 346 in the rayon, #1689 of 1856 in the oblast.

Lubny, the rayon centre, is 48 km away. 110 m above sea level. 48 km away: Lubny, the nearest bigger centre, 1,146 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 81 km. 12.22 m between rows, pitch 16.04 m (latitude 50.1°).

Yield of 1 kWp
1,126kWh/year
Tilt
37°1° east of south
10 kW
11,255kWh/year
Row pitch
16.04m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Polove

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 81 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb92Mar117Apr139May142Jun147Jul143Aug114Sep82Oct36Nov24Dec

July: 147 kWh/kWp, December: 24 — 6.1 times less.

November: 36 against 39 in the oblast, 7.7% less.

Polove: plants, kWh
kWpA yearJulyDecember
55,628735120
1011,2551,470240
1516,8832,205360

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.