Solar plant: site data

Solar power plant in Novodar, Lubenskyi Raion, Poltava Oblast

Novodar: 1,123 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.7% below the oblast median (1,142). #324 of 346 in the rayon, #1757 of 1856 in the oblast.

Lubny, the rayon centre, is 55 km away. 113 m above sea level. 48 km away: Pryluky, the nearest bigger centre, 1,116 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 83 km. 12.25 m between rows, pitch 16.07 m (latitude 50.2°).

Yield of 1 kWp
1,123kWh/year
Tilt
37°2° east of south
10 kW
11,227kWh/year
Row pitch
16.07m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Novodar

The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 83 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb91Mar117Apr139May143Jun147Jul143Aug114Sep82Oct36Nov24Dec

July: 147 kWh/kWp, December: 24 — 6.1 times less.

November: 36 against 39 in the oblast, 7.7% less.

Novodar: plants, kWh
kWpA yearJulyDecember
55,614735120
1011,2271,470240
1516,8412,205360

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.