Solar plant: site data

Solar power plant in Netrativka, Lubenskyi Raion, Poltava Oblast

Netrativka: 1,132 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.8% below the oblast median (1,142). #179 of 346 in the rayon, #1410 of 1856 in the oblast.

Lubny, the rayon centre, is 25 km away. 98 m above sea level. 25 km away: Lubny, the nearest bigger centre, 1,146 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 95 km. 12.25 m between rows, pitch 16.07 m (latitude 50.2°).

Yield of 1 kWp
1,132kWh/year
Tilt
37°1° east of south
10 kW
11,322kWh/year
Row pitch
16.07m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Netrativka

The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 95 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan58Feb96Mar118Apr139May142Jun145Jul142Aug113Sep81Oct37Nov25Dec

July: 145 kWh/kWp, December: 25 — 5.8 times less.

November: 37 against 39 in the oblast, 5.1% less.

Netrativka: plants, kWh
kWpA yearJulyDecember
55,661725125
1011,3221,450250
1516,9832,175375

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.