Solar power plant in Myrne, Poltavskyi Raion, Poltava Oblast

Myrne: 1,159 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.5% above the oblast median (1,142). #77 of 751 in the rayon, #254 of 1856 in the oblast.

Poltava, the rayon centre, is 43 km away. 121 m above sea level. 10 km away: Novi Sanzhary, the nearest bigger centre, the same 1,157. Snow and wind from the nearest regional centre in the DBN — Полтава, 43 km. 11.44 m between rows, pitch 15.26 m (latitude 49.3°).

Yield of 1 kWp
1,159kWh/year
Tilt
37°2° east of south
10 kW
11,594kWh/year
Row pitch
15.26m · GCR 0.31
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Myrne

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 43 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan59Feb97Mar117Apr137May143Jun147Jul146Aug118Sep86Oct42Nov29Dec

July: 147 kWh/kWp, December: 29 — 5.1 times less.

December: 29 against 25 in the oblast, 16.0% more.

Myrne: plants, kWh
kWpA yearJulyDecember
55,797735145
1011,5941,470290
1517,3912,205435

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Poltavskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.