Solar plant: site data
Solar power plant in Mykhailyky, Myrhorodskyi Raion, Poltava Oblast
Mykhailyky: 1,123 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.6% below the oblast median (1,142). #352 of 430 in the rayon, #1747 of 1856 in the oblast.
Myrhorod, the rayon centre, is 38 km away. 164 m above sea level. 14 km away: Shyshaky, the nearest bigger centre, 1,133 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 51 km. 12.06 m between rows, pitch 15.88 m (latitude 50.0°).
- Yield of 1 kWp
- 1,123kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,233kWh/year
- Row pitch
- 15.88m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,450 / 470Pa
Ground frame designer
A ground frame for a solar plant: Mykhailyky
The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 51 km: snow 1,450 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 147 kWh/kWp, December: 23 — 6.4 times less.
December: 23 against 25 in the oblast, 8.0% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,617 | 735 | 115 |
| 10 | 11,233 | 1,470 | 230 |
| 15 | 16,850 | 2,205 | 345 |
Example: a 10 kW ground frame
For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Maslivtsi2 km1,137 kWh/kWp
- Kharenky3 km1,124 kWh/kWp
- Hrebeniaky4 km1,140 kWh/kWp
- Manachynivka4 km1,138 kWh/kWp
- Koverdyna Balka4 km1,136 kWh/kWp
- Nosy4 km1,124 kWh/kWp
All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.