Solar plant: site data

Solar power plant in Miroshnyky, Myrhorodskyi Raion, Poltava Oblast

Miroshnyky: 1,141 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,142). #77 of 430 in the rayon, #1000 of 1856 in the oblast.

Myrhorod, the rayon centre, is 32 km away. 142 m above sea level. 14 km away: Velyka Bahachka, the nearest bigger centre, the same 1,144. Snow and wind from the nearest regional centre in the DBN — Полтава, 50 km. 11.85 m between rows, pitch 15.67 m (latitude 49.7°).

Yield of 1 kWp
1,141kWh/year
Tilt
37°2° east of south
10 kW
11,405kWh/year
Row pitch
15.67m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Miroshnyky

The designer opens with this place’s coordinates, latitude 49.7° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 50 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan55Feb94Mar117Apr139May143Jun147Jul146Aug117Sep84Oct39Nov25Dec

July: 147 kWh/kWp, December: 25 — 5.9 times less.

February: 55 against 56 in the oblast, 1.8% less.

Miroshnyky: plants, kWh
kWpA yearJulyDecember
55,703735125
1011,4051,470250
1517,1082,205375

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.