Leheidy: 1,135 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.6% below the oblast median (1,142). #164 of 430 in the rayon, #1293 of 1856 in the oblast.

Myrhorod, the rayon centre, is 39 km away. 117 m above sea level. 9 km away: Shyshaky, the nearest bigger centre, the same 1,133. Snow and wind from the nearest regional centre in the DBN — Полтава, 42 km. 11.94 m between rows, pitch 15.76 m (latitude 49.8°).

Yield of 1 kWp
1,135kWh/year
Tilt
37°2° east of south
10 kW
11,350kWh/year
Row pitch
15.76m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Leheidy

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 42 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan51Feb92Mar117Apr140May143Jun148Jul147Aug117Sep84Oct39Nov24Dec

July: 148 kWh/kWp, December: 24 — 6.2 times less.

February: 51 against 56 in the oblast, 8.9% less.

Leheidy: plants, kWh
kWpA yearJulyDecember
55,675740120
1011,3501,480240
1517,0252,220360

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.