Solar plant: site data

Solar power plant in Kuzmenky, Myrhorodskyi Raion, Poltava Oblast

Kuzmenky: 1,130 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.1% below the oblast median (1,142). #256 of 430 in the rayon, #1527 of 1856 in the oblast.

Myrhorod, the rayon centre, is 12 km away. 116 m above sea level. 11 km away: Velyka Bahachka, the nearest bigger centre, 1,144 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 75 km. 11.95 m between rows, pitch 15.77 m (latitude 49.9°).

Yield of 1 kWp
1,130kWh/year
Tilt
37°2° east of south
10 kW
11,295kWh/year
Row pitch
15.77m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Kuzmenky

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 75 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan53Feb92Mar118Apr139May143Jun147Jul146Aug116Sep84Oct38Nov24Dec

July: 147 kWh/kWp, December: 24 — 6.1 times less.

January: 31 against 35 in the oblast, 11.4% less.

Kuzmenky: plants, kWh
kWpA yearJulyDecember
55,648735120
1011,2951,470240
1516,9432,205360

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks