Solar plant: site data
Solar power plant in Kovaleve, Poltavskyi Raion, Poltava Oblast
Kovaleve: 1,134 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.7% below the oblast median (1,142). #666 of 751 in the rayon, #1345 of 1856 in the oblast.
Poltava, the rayon centre, is 43 km away. 129 m above sea level. 19 km away: Kotelva, the nearest bigger centre, the same 1,138. Snow and wind from the nearest regional centre in the DBN — Полтава, 43 km. 12.01 m between rows, pitch 15.83 m (latitude 49.9°).
- Yield of 1 kWp
- 1,134kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,338kWh/year
- Row pitch
- 15.83m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,450 / 470Pa
Ground frame designer
A ground frame for a solar plant: Kovaleve
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 43 km: snow 1,450 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 146 kWh/kWp, December: 24 — 6.1 times less.
January: 38 against 35 in the oblast, 8.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,669 | 730 | 120 |
| 10 | 11,338 | 1,460 | 240 |
| 15 | 17,007 | 2,190 | 360 |
Example: a 10 kW ground frame
For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Stadnytsia2 km1,134 kWh/kWp
- Malovydne2 km1,136 kWh/kWp
- Marine5 km1,140 kWh/kWp
- Kapranske5 km1,140 kWh/kWp
- Velyka Rublivka5 km1,138 kWh/kWp
- Berëzovo6 km1,138 kWh/kWp
All places: Poltavskyi RaionPoltava Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.