Solar plant: site data
Solar power plant in Kolodna, Lubenskyi Raion, Poltava Oblast
Kolodna: 1,152 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.9% above the oblast median (1,142). #12 of 346 in the rayon, #463 of 1856 in the oblast.
Lubny, the rayon centre, is 19 km away. 88 m above sea level. 19 km away: Lubny, the nearest bigger centre, 1,146 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 76 km. 11.95 m between rows, pitch 15.77 m (latitude 49.9°).
- Yield of 1 kWp
- 1,152kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,520kWh/year
- Row pitch
- 15.77m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Kolodna
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 76 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 147 kWh/kWp, December: 25 — 5.9 times less.
February: 58 against 56 in the oblast, 3.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,760 | 735 | 125 |
| 10 | 11,520 | 1,470 | 250 |
| 15 | 17,280 | 2,205 | 375 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.