Solar plant: site data

Solar power plant in Klepachi, Lubenskyi Raion, Poltava Oblast

Klepachi: 1,142 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,142). #65 of 346 in the rayon, #903 of 1856 in the oblast.

Lubny, the rayon centre, is 7 km away. 160 m above sea level. 7 km away: Lubny, the nearest bigger centre, the same 1,146. Snow and wind from the nearest regional centre in the DBN — Черкаси, 96 km. 12.43 m between rows, pitch 16.20 m (latitude 50.1°).

Yield of 1 kWp
1,142kWh/year
Tilt
38°1° east of south
10 kW
11,423kWh/year
Row pitch
16.20m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Klepachi

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 96 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan59Feb96Mar118Apr139May143Jun146Jul144Aug114Sep82Oct37Nov26Dec

July: 146 kWh/kWp, December: 26 — 5.6 times less.

January: 39 against 35 in the oblast, 11.4% more.

Klepachi: plants, kWh
kWpA yearJulyDecember
55,712730130
1011,4231,460260
1517,1352,190390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.